RGS logo
Resilient Grid Solutions
Powering communities when it matters most
We keep critical Texas operations online when ERCOT fails.
Built by operators with real ERCOT outage experience, focused on accountability, not equipment sales.
Resilient Grid Solutions designs, deploys, and operates resilience systems that protect mission critical loads during grid disruptions. We get paid for outcomes, not equipment.
Built for municipalities, water and wastewater, industrial operations, and energy infrastructure in West Texas.
Reality check
Rolling outages and extended blackouts break backup plans.
Generator only setups fail on fuel, maintenance gaps, transfer issues, and human intervention.
When it fails, the responsibility lands on you, not the grid.
Recent ERCOT reality
These are not opinions. These are the operating conditions.
  • Summer all time peak demand: 85,508 MW on 08/10/2023
  • Summer peak demand: 85,425 MW on 08/20/2024
  • Winter all time peak demand: 80,560 MW on 02/20/2025
  • ERCOT minimum target reserve margin: 13.75%
  • ERCOT CDR warns planning reserve margins can fall sharply and may cross into negative values in 2026 or 2027 depending on season
Sources: ERCOT Peak Demand Records, ERCOT Resource Adequacy, ERCOT Capacity Demand and Reserves, December 2024.
Resilience as a Service, built around accountability.
Technology is the method, not the pitch. Outcomes are the product. This is ERCOT resilience built for critical infrastructure uptime.
Diagnose
ERCOT Failure Readiness Assessment
A paid, fixed scope diagnostic that confirms whether your current backup plan survives real world outage conditions.
Prove
Onsite Resilience Pilot
A controlled deployment focused on your critical loads, with monitoring, dispatch, and defined performance targets.
Operate
Resilience as a Service Contract
Multi year operational coverage with monitoring, maintenance, dispatch protocols, and clear uptime definitions.
What you get in 7 to 10 business days
A verdict you can use for leadership decisions, procurement, and grant planning.
  • Pass or fail readiness verdict tied to ERCOT outage scenarios
  • Failure points, downtime exposure, and consequences
  • Minimum required capability and decision options
Paid, fixed scope diagnostic. Credited toward implementation if you move forward.
If budget timing is tight, raise it on the operator call.
We do not sell hope. We sell operational certainty.
If your plan depends on perfect conditions, it is not a plan. We engineer and operate for the conditions you actually face during grid stress.